Media library

In our media library you have access to documents, photo and graphic material. Filter conveniently by category and/or year or enter a term in the search field. Find all videos about our company, our products and services in the video overview.

Price sheet, hydrogen network access / pdf / 70.47 KB

Price Sheet of Open Grid Europe GmbH for entry and exit contracts in the hydrogen network GET H2

This price sheet is part of the General Terms and Conditions for Entry/Exit Contracts Governing the Transportation of Hydrogen in the GET H2 Network of Multiple Network Operators in the currently valid version (GTC). Valid for hydrogen transports from commissioning of the first part of the GET H2 Network of Open Grid Europe GmbH (expected in Q1 2026). Status 17 July 2025

Others / pdf / 1.83 MB

Compression and hydrogen transport: A technical and economic analysis

Wasserstoff-Leitprojekt TransHyDE, 05/2025 EN

Press releases / pdf / 126.51 KB

TENP III goes into operation

New pipeline strengthens security of supply and paves the way for hy-drogen transport.

Press releases / jpg / 2.18 MB

Press photo: TENP III goes into operation

Symbolically assembled the three construction phases of TENP III (from left to right): Klemens Ficht (Vice President of the Freiburg Government), Detlef Brüggemeyer (Managing Director of OGE), Gérard Kimus (Managing Director of Fluxys TENP).

Press releases / pdf / 154.39 KB

H2med Hydrogen Corridor Reaches Key Milestone with the Launch of the BarMar Company

Today, transmission System Operators, Enagás (Spain) ―through its affiliate Enagás Infraestructuras de Hidrógeno (EIH)―, NaTran and Teréga (France) announced a significant step forward for the H2med project with the signing of a Shareholders' Agreement.

Price sheet, hydrogen network access / pdf / 421.60 KB

Terms and conditions for entry/exit agreements for the transportation of hydrogen on the GET H2 network operated by multiple network operators

issued by the hydrogen network operators Nowega GmbH, Open Grid Europe GmbH and Thyssengas GmbH dated 23 June 2025

Market information natural gas/biogas / pdf / 138.98 KB

Capacity allocation restrictions and point-to-point connections for dynamically allocable capacities

with effect from 01 June 2025 - PDF file

Market information natural gas/biogas / xlsx / 24.02 KB

Capacity allocation restrictions and point-to-point connections for dynamically allocable capacities

with effect from 01 June 2025 - XLSX file

Press releases / pdf / 191.45 KB

Executive Vice-President of the European Commission Teresa Ribera receives H2med Consortium CEOs

This Tuesday, June 24, the Executive Vice-President for a Clean, Just and Competitive Transition at the European Commission, Teresa Ribera, has received the five CEOs of the H2med consortium: Arturo Gonzalo (Enagás, Spain), Pierre Duvieusart (Deputy CEO NaTran, France), Thomas Hüwener (OGE, Germany), Rodrigo Costa (REN, Portugal) and Carolle Foissaud (Teréga, France) to discuss the progress of the H2med clean hydrogen corridor project

Brochure / pdf / 1.72 MB

GasCam®

Leak testing of gas installations and above-ground piping, June 2025 (only in German)

Brochure / pdf / 1.07 MB

High-pressure gas pipeline maintenance

Monitoring / Inspection / Maintenance / Repair, Data sheet (only in German), June 2025

Brochure / pdf / 1.63 MB

Gas analysis / Chemical engineering / Analysis of operating materials

Gas Quality Competence Centre (only in German), March 2021

Price sheet, Network access natural gas/biogas / pdf / 90.73 KB

Information on tariff and multipliers of Open Grid Europe GmbH

for the yearly product of the gas year 2025/2026

Price sheet, Network access natural gas/biogas / xlsx / 253.35 KB

Fees charged by Open Grid Europe GmbH according to Section 21 (3) sentence 2 EnWG (automated readout)

Vaild from 01 January 2026, 06:00 a.m., until 01 January 2027, 06:00 a.m

Price sheet, Network access natural gas/biogas / pdf / 46.91 KB

Fees charged by Open Grid Europe GmbH at interconnection points according to Regulation (EU) 2017/459 in the Trading Hub Europe GmbH market area

Vaild from 01 January 2026, 06:00 a.m., until 01 January 2027, 06:00 a.m.

Price sheet, Network access natural gas/biogas / pdf / 64.83 KB

Fees charged by Open Grid Europe GmbH at storage facilities in the Trading Hub Europe GmbH market area

Vaild from 01 January 2026, 06:00 a.m., until 01 January 2027, 06:00 a.m.

Market information natural gas/biogas / pdf / 400.11 KB

Ruling of the Federal Network Agency BK9-24/612

Decision ‘MARGIT 2026‘ of 22/05/2025 (only in German)

Market information natural gas/biogas / pdf / 304.87 KB

Publication by Open Grid Europe GmbH according to the network code on harmonised transmission tariff structures

Art. 29 and 30 of Regulation (EU) 2017/460 (Network Code Tariffs)

Press releases / pdf / 116.92 KB

A place for technical expertise, innovation and creativity

OGE's Future Workshop offers new opportunities for technical training

Suppliers / pdf / 3.03 MB

Safety Requirements for Contractors

lays down safety rules to be observed by all contractors