H₂ PCI projects

H2ercules Network West

Last updated: 30 September 2026

Provided information is based on the Hydrogen Core Network as approved on 22 October 2024 by the Federal Network Agency (Bundesnetzagentur). However, they are subject to review within the Network Development Plan (NDP) process.

Karte des Leitungsabschnitts

Schematic representation of the pathway

H2ercules Network West connects the Belgian network to the German hydrogen core network. It links major consumption centers in the Rhineland, as well as other regions of Germany via adjacent H2ercules sections. Through the Belgian network, various hydrogen sources — such as terminals in the Antwerp and Zeebrugge areas — can be connected to the German hydrogen core network.

The H2ercules Belgium (222B) section forms the hydrogen pipeline system from the Eynatten border crossing on the German-Belgian border to the demand centers in the Rhineland near Weisweiler. This approximately 27-kilometer-long, newbuilt pipeline is scheduled to go into operation by 2028.

Fact sheet

approx. 27 km

Length

Aachen — Weisweiler

Route

2028

Comissioning

up to 91,2 GWh/d from BE to DE

Cross-border transmission capacity

in Progress

Status

Open Grid Europe GmbH

Pipeline operator